Another successful delivery and installation of air heater tubes to Bundaberg Walkers for a Sugar Mill project!
This time 19,000 pieces of 304 SS welded tubes weighing 70,000kg.
273 hex packs were delivered directly to site in containers and loaded straight into the job. The entire shipment
left on time and the tubes were installed and expanded smoothly.
FFF Australia is happy to once again support local fabricators and the sugar industry!
[gridzy id=”42″]