CONVECTION BANK TUBES

Boiler Convection Bank Swaged & Bent Tubes
Boiler Convection Bank Swaged & Bent Tubes project-managed, quality certified and delivered to a satisfied customer. Great feedback resulting in additional orders for the next two boiler retube packages.
Manufactured with high precision and swaged ends 100% checked with ring gauges to guarantee a ±0.1mm tolerance on both OD and wall thickness. All bends laid out and checked on a full scale template of the boiler to ensure seamless installation onsite. Packed in built-for-purpose transportable frames.
FFF can offer on all package types of replacement boiler tubes including furnaces, convection banks, superheaters, economisers, air heaters and water-walls. Boiler Tube material grades in seamless carbon steel and/or chrome molybdenum, plain or finned; can be supplied with adherence to any additional client-specific requirements.
Got a retube coming up? Let FFF Australia project manage the tube supply and ensure your shutdown is successful.
International Strategic Sourcing Specialists giving all Australian businesses access to the global supply chain.